| Tamping down the backfill in the garage, in preparation for garage floor to be poured (6/1/16) |
![]() |
| Running all of the underground lines |
![]() |
| Three different trenches - one to the back of the property for water hydrant/electricity |
![]() |
| Putting down the Visqueen before they sprayed the gravel in the crawlspace. |
![]() |
| Gravel sprayed in Crawlspace 6/2/16 |
![]() |
| There is usually a "crew" there - inspecting :) |
![]() |
| Gravel in the garage. |
![]() |
| Garage floor poured (6/3/16) |
![]() |
| Two little boys - checkin' things out. |
![]() |
| The gravel pile is great fun to play on while watching the framers. |
![]() |
| After the framers left for the day (Saturday night) - we proceeded to inspect. |
![]() |
| All of the outside walls are standing except the North wall. They will be back on Monday 6/6/16 to finish it up to square, and put in the inside walls. |