The siding is coming along. We all help out. Thank goodness for the sunshade ! Roger cuts, Zac measures, and attaches, Grandma D hands to Zac, the boys haul the boxes around, I clean up. |
This picture doesn't show it, but the entire South side of the home is done now, along with the back and North side. We are still working on the front. |
The painters have been here, and they are mostly finished I think. |
We finally get to see the "shake" siding, which is in the dormers. It is really hard to put up compared to the vertical "board and batton", but it is more "forgiving" if a mistake is made. |
Some of the vertical is done on the front, |
Roland set the septic tank, and dug the drain field. It will be inspected today by the health dept. |
They hit some groundwater. |
The front porch is a PAIN. It will be SO good to get it done. I think the plan is to finish it up this weekend. |
We took a break from the siding during this week, and concentrated on tiling the bathrooms. Tagg is a big help. |
Zac even trusted him to work the tile saw ! |
The pantry |
The can holders |
The lockers |
More tiling. |
Everyone gets in on the action. Even Grandma Ben helped to "back butter" the pieces of tile ! |
Quite an accomplishment for an 8 year old I would say. |
The drain field is some new fangled thing that I need to have explained to me. I wish I could have seen this put in place, I would probably understand it better if I did. |
Some of the tile for the fireplace set in place. |