![]() |
| Zac and CJ are having a shop built at their place Beehive Buildings is doing it. It is pole construction |
![]() |
| They bought in trusses, secured them AROUND the poles.... |
![]() |
| Then a big crane came and lifted them up. |
![]() |
| In goes the UNDERGROUND PLUMBING |
![]() |
| Cement floor in |
![]() |
| Steel exterior in progress |
![]() |
| Loft area in the back |
![]() |
| Trex stairs coming out the back/side of the shop into the yard |
![]() |
| Upper Loft area |
![]() |
| R for Rich Such a nice looking building. Lots of comments/compliments on it. It looks really nice next to their house. It took about a month to build. |












No comments:
Post a Comment